The pipe stranding machine is made of special steel plate processing, and its pipe body is annealed to remove ground stress, and the dynamic balance of the rotor of the trochanter is developed in the form of balanced solution and lifting, so as to ensure the overall It has the characteristics of stable rotation speed, high impact toughness, high stability, high production and processing efficiency, low energy consumption, compact structure, stable operation, convenient actual operation and low operation noise. And its overall structure is a relatively simple one-piece structure, special-purpose machinery and equipment are used for production, processing, and inspection, and the inspection precision is very high, which enhances the quality of the pipe stranding machine. The key part of it is composed of single winch, tic-trailer, front box, tube section member, disconnecting parking equipment, wire reel frame, roller shaft, wire die base, meter counter, double traction pulley equipment, gear Transmission system, φ1600 mobile take-up rack, electrical cabinet and safety protection cover, etc. Seeing that there are so many features of the pipe twister, it is very likely that many consumers choose to use it. However, some accidents will inevitably occur in the application of industrial equipment, so what are the emergency measures for accidents when using the pipe twister? ?
(1) When an accident occurs, the injured should be treated and reported to the company leaders immediately to maintain the scene of the traffic accident.
(2) When a personal safety accident occurs, the power supply should be tripped and turned off immediately, so that the person in the electric shock accident can get rid of the switching power supply and perform human rescue, and immediately send it to the hospital outpatient clinic. Those who have an electric shock accident should take measures to avoid falls when they are likely to fall after getting rid of the switching power supply.
(3) When a facility problem occurs, the actual operation should be terminated immediately, power off, and the actual operation should be completed after the problem is cleared.