+86-13255202262

What Is The Work That The Operator Needs To Prepare Before The Production Of The Pipe Stranding Machine?

May 23, 2022

Before the production of the pipe stranding machine, you should wear labor protection equipment, prepare the production tools, and receive materials according to the production tasks and process regulations to ensure that the received materials are qualified, and at the same time, check the machine and rotation before use. , At each rotating gear, lubricating oil should be added to different parts. To better ensure its lubricating effect, at the same time, press the excited switch for idling before work to determine the steering of the ketone body according to the process, and it can be used normally during the operation of the equipment, and the second is to install it according to the requirements of the process. Well, the pitch wheel is selected and the split lamination film is installed in the grinding frame. The second is to open the protective cover and pull apart the spring pins on the side, and take out the threads from the basket respectively. And there is a brake pin on one side of the cradle, so in the process of use, adjust the tension of the full spool according to the diameter of the wire.

2

Send Inquiry