1. Check that the manufacturing operation process conforms to the requirements of the process card;
2. Check that the appearance of the pipe stranding machine is shiny, the compaction is excellent, and there is no missing strands, leaking lines, leaking packages, etc.;
3. Check that the loading volume of the process flow meets the requirements of the upper disk, the coil is intact, and the lines are neatly arranged.
4. Check the multi-strand multi-strand non-electric conductors and blackening conditions in the process flow;
5. Determine the number and orientation of multiple strands in the upper process flow, the signs are detailed, and the lines are neatly arranged;
6. Check that the packaging is intact, and the signs and dimensions are consistent with the processing technology regulations.





